Motion to accept the construction improvements of the Grand Avenue and Airport Boulevard Streetscape Improvements Project (No. st1801, Bid No. 2657) as complete in accordance with plans and specifications (Total Construction Cost $3,696,221.92). (Jeffrey Chou, Senior Civil Engineer)
label
RECOMMENDATION
Recommendation
It is recommended that the City Council, by motion, accept the construction improvements of the Grand Avenue and Airport Boulevard Streetscape Improvements Project (No. st1801, Bid No. 2657) as complete in accordance with plans and specifications (Total Construction Cost $3,696,221.92).
Body
BACKGROUND/DISCUSSION
On June 8, 2022, the City Council awarded a construction contract to CF Contracting, Inc. to build pedestrian and bicycle improvements at the intersection of Grand Avenue and Airport Boulevard. The project closes a key gap between the Caltrain Station's West Plaza and the pedestrian and bicycle connections serving the City's downtown area. Key improvements include:
* Removing the concrete islands and "slip lane" at the southeast corner to eliminate the free right-turn movement, requiring vehicles to stop on red before turning right;
* Adding curb extensions and Americans with Disabilities Act (ADA)-compliant curb ramps at the southwest and southeast corners to shorten pedestrian crossing distances and improve visibility for both pedestrians and drivers;
* Replacing the standard crosswalk on the southern leg with high-visibility striping and dual pedestrian and bicycle crosswalks; and
* Installing protected bike lanes between Miller Avenue and Baden Avenue.
The work was inspected by the Engineering Division and found to be complete in accordance with the contract documents as of August 12, 2024. One ongoing item remains with Pacific Gas and Electric (PG&E) regarding the adjustment of their manholes that were paved over, which has not yet been resolved due to a lack of response by PG&E. The Contractor and City staff will contin...