File #: 24-699    Name:
Type: Motion Status: Passed
File created: 7/2/2024 In control: City Council
On agenda: 6/25/2025 Final action: 6/25/2025
Title: Motion to accept the Training Tower Maintenance Project (pf1704) improvements as complete in accordance with project documents. (Lawrence Henriquez, Senior Civil Engineer)
Attachments: 1. Attachment 1_Vicinity Map, 2. Attachment 2_Live Fire Training Structure
Title
Motion to accept the Training Tower Maintenance Project (pf1704) improvements as complete in accordance with project documents. (Lawrence Henriquez, Senior Civil Engineer)

Label
RECOMMENDATION
Recommendation
Staff recommends that the City Council, by motion, accept the Training Tower Maintenance Project improvements as complete in accordance with the inspection reports provided by Fire Safety & Inspection Services, LLC.

Body
BACKGROUND/DISCUSSION
The Fire Department's Live Fire Training Structure (LFTS) is located at Fire Station No. 61 at 480 North Canal Street (Attachment 1). The structure was built in 2006 and is a custom structure that Fire Facilities, Inc. installed. It consists of a 6-story tower, a 2-story residence, and a one-story annex (Attachment 2). The Fire Department hosts numerous training sessions throughout the year, and assurance that the LFTS's components are in good working condition is vital to its yearly operations and functionality. For example, the LFTS contains burn room components for training exercises that need to be reliable and devoid of malfunctions when operating. Therefore, it is critical that the LFTS inner workings are kept in premium condition. The LFTS is constantly in use throughout the year and is an integral part of the Fire Department's training regimen.

On November 8, 2023, City Council awarded the Training Tower Maintenance Project ("Project") to Draeger, Inc., Fire Facilities, Inc., and to Burke Construction. The project replaced the Training Tower's interior components such as the gas detection system, exterior estops, upgraded the fire props control system, replaced cover hallway detectors, gas detector cover panels, exterior exhaust fans; replaced the tower's roof, catwalk, and provided a full electrical system upgrade. The Training Tower is heavily used throughout the year, and since it's installment in 2006, the project's work represented the first significant rehabilitation effort. Lastly, the Bu...

Click here for full text