Title: Motion accepting the South San Francisco/San Bruno Water Quality Control Plant (WQCP) Wet Weather and Digester Improvements Project (Project No. ss1301) as complete per plans and specifications (Total Construction Cost $53,730,227.00). (Brian Schumacker, Water Quality Control Plant Superintendent)
Attachments: 1. Attachment 1 - 23-514 Visual Staff Report
Title
Motion accepting the South San Francisco/San Bruno Water Quality Control Plant (WQCP) Wet Weather and Digester Improvements Project (Project No. ss1301) as complete per plans and specifications (Total Construction Cost $53,730,227.00). (Brian Schumacker, Water Quality Control Plant Superintendent)

label
RECOMMENDATION
Staff recommends that the City Council, by motion, accept the construction improvements of the WQCP Wet Weather and Digester Improvement Projects (Project No. ss1301) as complete per plans and specifications (Total Construction Cost $53,730,227.00)

Body
BACKGROUND/DISCUSSION
On July 11, 2018, the City Council of South San Francisco awarded the WQCP Wet Weather and Digester Improvements Project (Project) to Flatiron West, Inc. Carollo Engineers, designed the Project to comply with the City's National Pollution Discharge Elimination System (NPDES) permit requirements.
The Project includes two project elements:

1. Mandated Wet Weather Flow Improvements: This project element increases the peak secondary treatment capacity at the WQCP by ten million gallons per day (MGD) to a total capacity of 40 MGD by:
a. Installing a new secondary clarifier with associated equipment and piping, and
b. Upgrading associated secondary treatment facilities such as improvements to the aeration basins. These improvements will enhance sludge settleability, increase flow conveyance to the secondary treatment system and increase automation of the treatment process.

This element also includes construction of two storm water pump stations and associated piping systems to capture and treat stormwater runoff from the plant grounds.

2. Mandated Digester Replacement and Rehabilitation: This project element replaces/rehabilitates aging infrastructure and improves WQCP reliability. The element includes demolition of two of the five existing digesters (Digester No's. 1 and 2). The element replaces these two digesters with one new digester (utilizing a high-solids diges...