Title
Report regarding a resolution adopting a proposed list of projects for fiscal year 2025-26 funded by SB1: The Road Repair and Accountability Act of 2017. (Lawrence Henriquez, Senior Civil Engineer)
label
RECOMMENDATION
Recommendation
It is recommended that the City Council adopt a resolution approving a proposed list of projects for fiscal year 2025-26 funded by SB1: The Road Repair and Accountability Act of 2017.
Body
BACKGROUND/DISCUSSION
Senate Bill 1 (SB1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide.
Regulations contained within SB1 require the City to submit to the California Transportation Commission an adopted list of projects proposed to use funds from the Road Maintenance and Rehabilitation Account (RMRA), created by SB1 by July 1, 2025. All projects proposed to receive the fiscal year funding must be adopted by resolution and include the description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement.
This is the ninth year in which the City is receiving SB1 funding, which will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB1. The City is expected to receive $1,794,492 in RMRA funding in fiscal year (FY) 2025-26 from SB1.
The SB1 project listed for FY 2025-26 is part of the City’s current Capital Improvement Program (CIP), which highlights the City’s needed improvements and priorities for implementation. This year’s funding from SB1 will help the City maintain and rehabilitate roads throughout the City. By adopting the proposed list of projects, the City is not committing to a specific dollar allocation for each project. City staff has incorporated the SB1 funding into the FY 2025-26 CIP budget, consistent with this staff report and the details presented to Council.
The following newly proposed project is expected to receive SB1 funds as a funding source for FY 2025-26. This project will be listed to be in-part or solely funded with FY 2025-26 RMRA revenues:
Pavement Management Plan (PMP) 2026 Street Surface Seal (Area 2)
Project Description: This project will consist of local street surface seal treatment consisting of localized pavement failure repairs, failed concrete curb, gutter, valley gutter replacement, crack seal, surface seal pavement surface treatment and replacing all existing striping and pavement markings. Useful life elements include concrete repairs, localized pavement repairs, and pavement surface treatment. Design & construction of street surface seal project as part of the Pavement Management Program (PMP) that will cycle through Areas 1-6, one area each year providing new surface seal of streets with new thermoplastic striping, legends, and crosswalks; 2026 will cycle through Area 2.
Project Location: Surface Seal of Area 2, which includes the Serra Highlands neighborhood.
Street Name |
Begin |
End |
Camaritas Ave |
Arroyo Dr |
Westborough Blvd |
Camaritas Ave |
El Campo Dr |
Del Paso Dr |
Camaritas Ave |
N End (Park Entrance) |
Altura |
Camaritas Ave |
Altura |
El Campo Dr |
San Felipe Ave |
Serra Dr |
Newman Dr |
Alta Loma Dr |
El Campo Dr |
End |
Alta Loma Dr |
Arroyo Dr |
Del Paso Dr |
Alta Loma Dr |
Del Paso Dr |
El Campo Dr |
San Felipe Ave |
Alta Loma Dr |
Del Monte Ave |
San Felipe Ave |
Del Monte Ave |
Serra Dr |
Camaritas Ave |
Del Paso Dr |
Arroyo Dr |
Chico Ct |
Alta Loma Dr |
End |
Del Paso Dr |
Alta Loma Dr |
Arroyo Dr |
Del Paso Dr |
Alta Loma Dr |
Indio Dr |
Bonita Ave |
Del Paso Dr |
El Campo Dr |
Carmelo Ln |
Bonita Ave |
El Campo Dr |
El Campo Dr |
Alta Loma Dr |
Camaritas Ave |
El Campo Dr |
Camaritas Ave |
Del Monte Ave |
El Campo Dr |
Del Monte Ave |
Alta Mesa Dr |
El Campo Dr |
Alta Mesa Dr |
105 ft. S/O Tunitas Ln |
El Campo Dr |
175 ft. S/O Alta Mesa Dr |
Alta Mesa Dr. |
El Campo Dr EB |
105 ft. S/O Tunitas Ln |
175 ft. S/O Alta Mesa Dr |
El Campo Dr WB |
175 ft. S/O Alta Mesa Dr |
105 ft. S/O Tunitas Ln |
Tunitas Ln |
El Campo Dr |
End |
Indio Dr |
El Campo Dr |
Arroyo Dr |
Del Monte Ave |
Arroyo Dr |
El Campo Dr |
Del Monte Ave |
El Campo Dr |
San Felipe Ave |
Del Monte Ave |
San Felipe Ave |
Romney Ave |
Del Monte Ave |
Romney Ave |
Alta Loma Dr |
Camaritas Ave |
Alta Loma Dr |
Alta Loma School |
Camaritas Ave |
Alta Loma Dr |
Hickey Blvd |
Camaritas Cir |
Alta Loma Dr |
Camaritas Ave. |
Alta Loma Dr |
Camaritas Ave. |
End (Alta Loma School) |
Mc Donell Dr |
Alta Loma Dr |
Mc Donell Dr |
Alta Loma Dr |
Camaritas Ave |
Newman Dr |
Keats Ave |
Byron Dr |
Alta Loma Dr |
Byron Dr |
Newman Dr |
Del Monte Ave |
El Rancho Dr |
Del Monte Ave |
920' S/O Del Monte Ave (N) |
El Rancho Dr |
920' S/O Del Monte Ave (N) |
Del Monte |
Romney Ave |
Keoncrest Dr |
Del Monte Ave |
Romney Ave |
Del Monte Ave |
E END |
Joaquin Dr |
Romney Ave. |
La Crosse Ave. |
Theresa Dr |
Romney Ave. |
La Crosse Ave. |
Zita Dr |
Romney Ave. |
La Crosse Ave. |
La Crosse Ave |
Serra Dr |
Del Monte Ave |
Serra Dr |
Southcliff Ave. |
San Felipe Ave. |
Serra Dr |
San Felipe Ave. |
Romney Ave. |
Serra Dr |
Romney Ave. |
Newman Dr. |
Arroyo Dr |
Junipero Serra Blvd. |
Alta Mesa Dr. |
Arroyo Dr |
Alta Mesa Dr. |
Cuesta Dr. |
Arroyo Dr |
Cuesta Dr. |
Alta Loma Dr. |
Alta Mesa Dr |
Arroyo Dr. |
El Campo Dr. |
Alta Mesa Dr |
El Campo Dr |
King Dr |
Alta Mesa Dr |
King Dr. |
Arroyo Dr. |
Cuesta Dr |
Arroyo Dr |
Verano Dr |
Cuesta Dr |
Verano Dr |
Alta Mesa Dr |
Escanyo Dr |
Alta Mesa Dr |
Berenda Dr |
Escanyo Dr |
Berenda Dr |
Arroyo Dr |
Erica Dr |
Arroyo Dr |
Casey Dr |
Casey Dr |
Arroyo Dr |
Escanyo Dr |
Berenda Dr |
Escanyo Dr. |
Arroyo Dr. |
Lomitas Ave NB |
Arroyo Dr |
Cuesta Dr |
Lomitas Ave SB |
Cuesta Dr |
Arroyo Dr |
Lomitas Ave |
Cuesta Dr |
Alta Mesa Dr |
Escanyo Dr |
Arroyo Dr |
Arroyo Dr |
King Dr |
Alta Mesa Dr. |
Newman Dr. |
King Dr |
Newman Dr |
Junipero Serra Blvd |
Newman Dr |
Alta Mesa Dr |
King Dr |
Newman Dr |
King Dr |
San Felipe Ave |
Newman Dr |
San Felipe Ave |
Serra Dr |
Newman Dr |
Serra Dr |
Clay Ave |
Newman Dr |
Clay Ave |
Hilton Ave |
Duval Dr |
Elkwood Dr |
Arlington Dr (S) |
Duval Dr |
Elkwood Dr |
Arlington Dr (N) |
Arlington Dr |
El Camino Real |
Duval Dr |
Arlington Dr |
Duval Dr (W) |
Duval Dr (E) |
Bradford Dr |
Duval Dr |
Arlington Dr |
Graystone Dr |
Duval Dr |
Bradford Dr |
Calvert Ave |
Arlington Dr |
Graystone Dr |
Elkwood Dr |
Duval Dr (N) |
Duval Dr (S) |
Felton Ave |
Elkwood Dr |
Duval Dr |
Hilton Ave |
Hickey Blvd |
Duval Dr |
Verano Dr |
336 ft. S/O Alta Mesa Dr |
Arroyo Dr |
Verano Dr |
Alta Mesa Dr |
336 ft. S/O Alta Mesa Dr |
Serena Ct |
Cuesta Dr. |
End |
Capay Cir |
Arroyo Dr (E) |
Verano Dr |
Capay Cir SB |
Arroyo Dr |
Verano Dr |
Capay Cir NB |
Verano Dr |
Arroyo Dr |
Verano Dr |
Arroyo Dr. |
Capay Cir. |
Jacinto Ln |
Arroyo Dr. |
Capay Cir. |
Southcliff Ave |
Arbor Dr. |
End |
Arbor Dr |
Southcliff Ave. |
Newman Dr. |
Southcliff Ave |
Arbor Dr |
King Dr |
Southcliff Ave |
King Dr |
April Ave |
Catherine Dr |
Southcliff Ave. |
San Felipe Ave. |
Clara Ave |
Camaritas Ave |
Alta Loma Dr |
Nyla Ave |
Serra Dr. |
Del Monte Ave. |
Los Flores Ave |
Camaritas Ave |
Alta Loma Dr |
Altura Way |
Camaritas Ave. |
Alta Loma Dr. |
April Ave |
Serra Dr. |
Southcliff Ave. |
Keoncrest Dr |
Romney Ave |
Newman Dr |
Keoncrest Dr |
San Felipe Ave |
Romney Ave |
Lamonte Ave |
Newman Dr. |
Keoncrest Dr |
Clay Ave |
Newman Dr |
Junipero Serra Blvd |
Kipling Ave |
Newman Dr |
Conrad Ct |
Conrad Ct |
End |
End |
Hilton Ave |
Kipling Ave. |
Newman Dr. |
Hilton Ave |
Newman Dr. |
Hickey Blvd. |
Gibbs Way |
Newman Dr. |
Kipling Ave. |
Clay Ave |
Junipero Serra Blvd. |
Longford Dr. |
Clay Ave |
Longford Dr. |
Dundee Dr. |
Clay Ave |
Dundee Dr |
W End |
Adrian Ave |
Longford Dr. |
Dundee Dr. |
Buxton Ave |
Longford Dr |
Dundee Dr |
Longford Dr |
Dundee Dr |
Clay Ave |
Longford Dr |
Clay Ave |
Hickey Blvd |
Dundee Dr |
Longford Dr |
Clay Ave |
Dundee Dr |
Clay Ave |
Longford Dr |
Wicklow Dr |
Clay Ave |
Dundee Dr |
Mansfield Dr |
Clay Ave |
Dundee Dr |
Mc Lellan Dr |
Orchid Dr |
Mc Lellan (End) |
Orchid Dr |
Cymbidium Cir |
Freesia Dr |
Freesia Dr |
Orchid Dr |
W End |
Freesia Dr |
Orchid Dr (S) |
Orchid Dr (N) |
Amaryllis Ct |
Orchid Dr. |
End |
Cymbidium Cir |
Hibiscus Dr |
Orchid Dr |
Miltonia Dr |
Cymbidium Cir. |
Cymbidium Cir. |
Clifden Dr |
Clay Ave. |
Dundee Dr. |
Norwich Dr |
Clay Ave |
Dundee Dr |
Dunman Way |
Dundee Dr |
Sutton Ave |
Sutton Ave |
Longford Dr |
W End |
Longford Dr |
Hickey Blvd |
End |
Mc Lellan Dr |
El Camino Real |
Orchid Dr. |
Junipero Serra Blvd |
City limits |
Hickey Blvd. |
Junipero Serra Blvd |
King Dr. |
Westborough Blvd. |
Junipero Serra Blvd |
King Dr |
Clay Ave |
Junipero Serra Blvd |
Clay Ave |
Hickey Blvd |
Cymbidium Cir |
Orchid Dr |
Hibiscus Dr |
Altamont Dr |
King Dr. |
Southcliff Ave. |
Hermosa Ln |
Camaritas Ave |
Alta Loma Dr |
Hickey Blvd |
Camaritas Ave |
El Camino Real |
Hickey Blvd |
Junipero Serra Blvd |
Camaritas Ave |
Hickey Blvd |
Longford Dr |
Junipero Serra Blvd. |
Estimated Project Schedule: Pre-construction 8/2025 - 4/2026
Construction 5/2026 - 10/2026
Estimated Project Useful Life: 5 to 10 years
The SB1 project list, and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety; investing in complete streets infrastructure; and using cutting-edge technology, materials, and practices; will have significant positive co-benefits statewide.
FISCAL IMPACT
The FY 2025-26 Capital Improvement Program presented this evening will appropriate RMRA funds to the listed project.
RELATIONSHIP TO STRATEGIC PLAN
Approval of this action will contribute to the City’s Strategic Plan outcome of improved Quality of Life by contributing funds to roadway improvement projects.
CONCLUSION
Approving the list of projects for RMRA funds will ensure that the City meets the deadline to submit a resolution adopting the list of projects proposed to be funded by RMRA to the California Transportation Commission by July 1, 2025.