Title
Report regarding a resolution approving Program Supplemental Agreement No. F028 Revision 3 with the State of California for the Bridge Preventive Maintenance Program (Project No. st1703) and authorizing the approval of Budget Amendment Number 27.001. (Lawrence Henriquez, Senior Civil Engineer)
label
RECOMMENDATION
Recommendation
It is recommended that the City Council adopt a resolution approving Program Supplemental Agreement No. F028 Revision 3 in the amount of $1,268,527 with the State of California for the Bridge Preventive Maintenance Program (Project No. st1703), authorizing the City Manager or designee to execute the document, and authorizing the approval of Budget Amendment Number 27.001 with a local match of $682,327 from Infrastructure Reserves.
Body
BACKGROUND/DISCUSSION
The City of South San Francisco (“City”) has an ongoing Bridge Preventive Maintenance Program (BPMP) for the sixteen (16) vehicle bridges that are under the California Department of Transportation (Caltrans) Bridge Inspection Program. The BPMP was created to help local agencies extend the life of their bridges by performing certain activities that have been preapproved by the Federal Highway Administration.
The Bridge Preventive Maintenance Program Goals are to:
1. Maintain the existing inventory of bridges in a structurally safe and serviceable condition.
2. Correct minor structural deficiencies early in a bridge's life, rather than wait until a bridge has major problems requiring costly rehabilitation, reconstruction, or replacement.
3. Extend the service lives of existing bridges.
4. Make efficient use of limited resources.
Caltrans inspects the bridges every two years and submits its findings to the City. City staff determines the appropriate actions based upon the reports and Caltrans work recommendations.
A summary of the recent bridge rehabilitation history and planned projects are outlined in the following table:
|
BRIDGE NO. |
DESCRIPTION |
NOTES |
|
#35C0032 |
Dunman St at Hickey Blvd |
Current BPMP (Design) + Repairs in 2013 |
|
#35C0079 |
Colma Creek Bridge at Chestnut Ave |
Current BPMP (Design) + Repairs in 2013 |
|
#35C0078 |
Colma Creek Bridge at Spruce Ave |
Current BPMP (Design) |
|
#35C0126 |
Colma Creek Bridge at Spruce Ave |
No work indicated per Caltrans Report |
|
#35C0031 |
Colma Creek Bridge at Linden Ave |
Current BPMP (Design) |
|
#35C0048 |
San Mateo Ave at Airport Blvd |
Repairs in 2013 project |
|
#35C0021 |
Colma Creek Bridge at Produce Ave |
Current BPMP (Design) |
|
#35C0101 |
Colma Creek Bridge at Utah Ave |
Current BPMP (Design) + Repairs in 2013 |
|
#35C0148L |
Grand Ave OH at US101 |
Current BPMP (Design) |
|
#35C0148R |
Grand Ave OH at US101 |
Current BPMP (Design) |
|
#35C0173 |
Oyster Pt Blvd OH at Gateway Blvd |
Current BPMP* (Design) + Repairs in 2013 |
|
#35C0044 |
San Bruno Canal Bridge at North Access Rd |
Bridge Replaced in 2018 (New Bridge No. #35C0164) |
|
#35C0046 |
San Bruno Canal Bridge at North Access Rd |
Current BPMP* (Design) + Repairs in 2013 |
|
#35C0047 |
San Bruno Canal Bridge at North Access Rd |
Current BPMP (Design) + Repairs in 2013 |
Thirteen (13) of the 16 City bridges under the Caltrans Bridge Inspection Program have been or will be rehabilitated.
Program Supplemental Agreement No. F028 Revision 3
On May 18, 2026, the City received the Program Supplemental Agreement (PSA) No. F028 Revision 3 from Caltrans authorizing funding for the nine (9) bridges (Attachment 1) in an amount of $1,268,527 for Construction and Construction Engineering.
|
1 |
#35C0021 |
Colma Creek Bridge at Produce Avenue |
Repair of Concrete barriers and steel railings, replacing joint seals, and miscellaneous concrete spall repair |
|
2 |
#35C0031 |
Colma Creek Bridge at Linden Avenue |
Treat bridge deck with methacrylate, concrete spall repairs, replace joint seals, repair concrete barriers and steel railings, repair uneven sidewalk and repair large hole in concrete sidewalk |
|
3 |
#35C0047 |
San Bruno Canal Bridge at North Access Road |
Provide cathodic protection to the pile extensions, (remove unsound concrete and repair spalled surfaces in pile extensions), inject cracks in pile extensions and bridge soffit |
|
4 |
#35C0078 |
Colma Creek Bridge at Spruce Avenue |
Treat bridge deck with methacrylate (polyester concrete overlay instead of only methacrylate), and concrete spall repairs on the barriers |
|
5 |
#35C0079 |
Colma Creek Bridge at Chestnut Avenue |
Clean exposed steel reinforcement and repair concrete spalls at bridge rails |
|
6 |
#35C0101 |
Colma Creek Bridge at Utah Avenue |
Clean joint seals and deck drains, epoxy inject concrete cracks, repair minor concrete spalls on the barriers, epoxy inject cracks at pier walls, and fill void space under the sidewalk |
|
7 |
#35C0032 |
Dunman Street at Hickey Boulevard |
Replace cracked portion of sidewalk, and repair minor concrete spalls, (epoxy inject concrete cracks in abutment, and Repair asphalt concrete pavement at West abutment) |
|
8 |
#35C0173 |
Oyster Pt Boulevard OH at Gateway Boulevard |
Repair grade difference on sidewalk and minor concrete spall repairs |
|
9 |
#35C0046 |
San Bruno Canal Bridge at North Access Road |
Remove, clean, and repair headers, and replace joint seals, (and epoxy inject concrete cracks in bridge soffit) |
The administration of state and federally funded local transportation projects is carried out by the benefiting agencies through the Caltrans Local Assistance Program. The City of South San Francisco has general authority as an administering agency; however, project-specific supplemental agreements are required for individual projects. The program supplement agreements allow for the reimbursement of project development costs. Program Supplement Agreement No. F028 Revision 3 authorizes Federal funding in the amount of $1,115,943 for construction and $152,584 in construction engineering for a total of $1,268,527. The City’s matching fund for construction is estimated at $682,327 from Infrastructure Reserves.
FISCAL IMPACT
The City has received Highway Bridge Program (HBP) funds in the past years for completing the design phase reflected in the table below. As the project transitions into the construction phase this year, Caltrans has programmed the construction funding which includes funding for construction engineering (construction support) for an amount of $1,268,527. Lastly, staff has requested additional funding for construction in the amount of $612,802 that Caltrans has approved informally, and therefore not shown in the table below.
|
FUNDING SOURCE |
AMOUNT |
PURPOSE |
|
General Fund |
$175,965 |
Construction |
|
Infrastructure Reserves |
$1,186,787 |
Construction |
|
Grant HBP - PSA #28 |
$115,089 |
Design (Expended) |
|
Grant HBP - PSA #28 Rev 2 |
$196,205 |
Design |
|
Grant HBP - PSA #28 Rev 3 |
$1,268,527 |
Construction / Construction Engineering |
|
Total |
$2,942,573 |
|
RELATIONSHIP TO CITY COUNCIL PRIORITIES ACTION PLAN
Approval of this action will contribute to City Council’s Priorities Action Plan major focus areas of improved Quality of Life and Infrastructure and the Environment, by providing a safe, convenient, and accessible transportation infrastructure system that is well-connected to the region through the quality maintenance of the City’s bridge infrastructure network.
CONCLUSION
Staff recommends that City Council adopt a resolution approving Program Supplemental Agreement No. F028 Revision 3 with the State of California for the Bridge Preventive Maintenance Program (Project No. st1703), authorizing the City Manager or designee to execute the document, and authorizing the approval of Budget Amendment Number 27.001 in the amount of $1,268,527 with a local match of $682,327 from the Infrastructure Reserves.