File #: 25-204    Name:
Type: Staff Report Status: Agenda Ready - Administrative Business
File created: 2/19/2025 In control: City Council
On agenda: 6/25/2025 Final action: 6/25/2025
Title: Report regarding a resolution approving the proposed Capital Improvement Program for fiscal year 2025-26. (Eunejune Kim, Director of Public Works/City Engineer and Matthew Ruble, Principal Engineer)
Attachments: 1. Attachment 1 - CIP Proposed Budget Book FY 25-26, 2. Attachment 2 - Funding Source Report FY 25-26, 3. Attachment 3 - Proposed Project Closures and Deferrals, 4. SB 343 - Attachment 4 - PowerPoint Capital Improvement Program FY 25-26
Related files: 25-205

Title

Report regarding a resolution approving the proposed Capital Improvement Program for fiscal year 2025-26. (Eunejune Kim, Director of Public Works/City Engineer and Matthew Ruble, Principal Engineer)

label

RECOMMENDATION

It is recommended that the City Council of the City of South San Francisco adopt a resolution approving the Capital Improvement Program (CIP) for Fiscal Year 2025-26, including appropriations request of $24.03 million; authorizing City staff to prepare plans and specifications and to advertise for construction bids for the projects under this program; incorporating the deferral and/or formal closure of select prior-year projects resulting in the reimbursement of $12.68 million in prior-year funding; and approve Budget Amendment Number 25.060 to the FY 2024-25 budget to reflect the reallocation.

BACKGROUND/DISCUSSION

The proposed Capital Improvement Program (CIP) for fiscal year (FY) 2025-26 was first reviewed by the Budget Standing Committee of the City Council, consisting of Mayor Flores and Vice-Mayor Addiego, on May 20, 2025, followed by a City Council study session on June 11, 2025. The proposed FY 2025-26 CIP incorporates the guidance and feedback provided by the City Council during these reviews. In accordance with Government Code Section 65401, the Planning Commission also reviewed the CIP on June 5, 2025, and adopted a resolution finding the CIP consistent with the General Plan.

The CIP outlines major capital expenditures and infrastructure improvement projects throughout the City, continuing investments in city streets, storm drains, sanitary sewers, facilities, parks, and traffic systems. Each year, City departments identify critical needs and prioritize project implementation when preparing the CIP to ensure resources are aligned with the City’s long-term goals.

City staff considers the following criteria when selecting projects for inclusion in the CIP:

                     Grant-funded projects requiring a City contribution.

                     Previously approved projects under construction or contract.

                     Projects required for regulatory compliance.

                     Projects to maintain or upgrade existing City infrastructure.

                     Projects with no General Fund allocations.

                     Projects requested by the community or City departments.

                     Projects that can be reasonably delayed, are complete, or are no longer necessary.

Based on these guidelines, staff proposes the following fiscal year (FY) 2025-26 CIP budget appropriations. The proposed FY 2025-26 CIP budget is $232.82 million, with $24.03 million of new appropriations and approximately $208.79 million of previous year appropriations for continuing projects. Additionally, the City has identified $12.68 million which can be redirected back to the City’s budget to help support the CIP budget needs for FY 2025-26 and out-years. 

The FY 2025-26 CIP includes 184 projects, 24 of which are requesting new appropriations for FY 2025-26. Of the 184 projects, there are 10 new projects and 174 continuing projects.

The CIP is comprised of six (6) project types:

                     Public Facilities

                     Parks

                     Storm Drains

                     Sanitary Sewer

                     Streets

                     Traffic

 

The following overview identifies proposed new projects and additional appropriation requests for continuing projects.

Public Facilities Projects - These projects renovate, construct, and improve City buildings and infrastructure.

New appropriations request:

There are no new public facilities appropriation requests for Fiscal Year 2025-26.

Total New Public Facilities Appropriation Requests = $0

Parks Projects - These projects replace and improve playgrounds, renovate sports fields, and expand parks at City-owned public spaces.

New appropriations request:

                     (pk2301) Orange Memorial Park Main Playground Replacement (BONDS) - Surfacing and equipment replacement of main playground at Orange Memorial Park. Equipment to be replaced with inclusive elements for all-abilities. - $865,073.24

                     (pk2302) Centennial Trail Improvements - Construct park spaces along Centennial Trail. - $1,666,279 

                     (pk2305) Linden Park Project - Project to transform two adjacent vacant lots into a vibrant neighborhood park and cultural plaza for our community to enjoy. - $300,000

                     (pk2501) Dedicated Pickleball Courts - Addition of Pickleball courts to Orange Park; additional costs to add noise attenuation and improved surfacing. - $400,000

                     New project (pk2601) Cypress and Pine Park Renovation Project - Improve and rehabilitate the existing Cypress and Pine Park with new play features, furnishings, landscape, and other improvements. - $3,000,000

                     New project (pk2602) Playground Surfacing City Hall Tot Lot, Avalon Park, Westborough Park - Replacement of rubberized surfacing that has reached end of life and is degraded beyond patch repairs. - $180,000

Total New Parks Appropriation Requests = $6,411,352.24

Storm Drain Projects - Projects repair and improve storm drains and infrastructure to reduce pollution run-off into the San Francisco Bay.

New appropriations request:

                     (sd1801) Orange Memorial Park Stormwater Capture Project - Design and construct a storm water capture device including pre-treatment system. - $20,000

Total New Storm Drain Appropriation Requests = $20,000

Sanitary Sewer Projects - Projects maintain the WQCP, collection system pumps stations, and sanitary sewer lines within the City.

New appropriations request:

                     (ss2202) Oyster Point Pump Station - The project will design and construct a new pump station to support the development at Oyster Point. - $2,850,000

                     New project (ss2601) Sanitary Sewer Rehab FY 2025-26 - Annual systematic rehabilitation of the sewer system gravity lines by sewer basins as determined by the sewer master plan and recent video inspection efforts prior to Surface Seal Area 2. - $5,800,000

                     New project (ss2602) Harbor Way Sewer Main Upsize - Upgrade of sewer main due to capacity constraints. - $500,000

                     New project (ss2603) Sanitary Sewer Pump Station Master Plan - Condition and Capacity assessment of all Pump Stations and associated force mains. - $500,000

Total New Sanitary Sewer Appropriation Requests = $9,650,000

Streets Projects - These projects repair bridges, resurface streets, improve medians and sidewalks, and study the feasibility of proposed roadway and rail extensions.

New appropriations request:

                     (st1703) Bridge Preventative Maintenance Program - This project will conduct preventative maintenance on nine (9) city-maintained bridges including: Colma Creek Bridge at Produce Avenue, Canal Bridge at Linden Avenue, two (2) bridges over San Bruno Channel over North Access Road, Colma Creek Bridge at Spruce Avenue, Colma Creek Bridge at Utah Avenue, Grand Ave. and San Bruno Channel over North Access Road. - $200,000

                     (st1904) Underground Utilities District (UUD) Rule 20A for Mission Road - Establish an Underground Utility District on Mission Road from Grand Avenue to connect with underground utilities at the South San Francisco BART south entrance. Additional funding is required to replace city-owned street lighting. - $1,500,000

                     (st2301) Junipero Serra Boulevard/Westborough Boulevard Corridor Feasibility Project - To fund the planning of the Junipero Serra Blvd and Westborough Blvd Bike and Ped improvements as identified in the Active South City Plan - $200,000

                     (st2505) 2026 Surface Seal Project - This project will provide asphalt pavement maintenance from design through construction in Area 2 (Sierra Highlands neighborhood) of the Pavement Management Program (PMP). - $3,300,000

                     New project (st2601) Tanforan Ave Reconstruction - Reconstruction of Tanforan Ave between San Mateo Ave and Railroad Place. - $100,000

                     New project (st2602) Citywide Misc Striping - This project includes the installation, replacement, and maintenance of roadway striping and pavement markings at various locations citywide. - $300,000

                     New project (st2603) Citywide Trip Hazard - Funds to be used to mitigate trip hazards identified as part of the trip hazard assessment. - $150,000

                     New project (st2604) 2027 Surface Seal - Street surface treatments with base repairs in preparation of 2027 surface seal project. - $200,000

                     New project (st2605) 2026 Pavement Repair and Crack Seal - A preventive maintenance program that includes repairs to localized defective pavement areas and crack sealing - $1,000,000

Total New Streets Appropriation Requests = $6,950,000

Traffic Projects - These projects focus on arterials, corridors, and key intersections within the City, including adaptive traffic signals to provide better traffic flow, improve pedestrian safety, traffic calming, and better bicycle rider safety on City streets.

New appropriations request:

                     (tr2002) Smart Corridor - Implementation of Intelligent Transportation System (ITS) along segment of 101 corridor north of I-380. - $350,000

                     (tr2301) Miscellaneous Traffic Improvements - Design & construct any traffic related improvements in the City, such as striping, signs, and other traffic calming measures from the Traffic Advisory Committee, Neighborhood meetings or as needed. - $250,000

                     (tr2406) Traffic Studies and Grant Support - Support for any traffic-related studies from the Traffic Advisory Committee, Neighborhood meetings or as needed, and support for grant applications as needed. - $100,000

                     (tr2415) Colma/SSF ECR Bicycle & Ped Improvement - Part of Bike/Ped master plan - $300,000

Total New Traffic Appropriation Requests = $1,000,000

Infrastructure Reserve Refund: To release financial resources for urgent needs, the City has decided to release Infrastructure Reserves previously allocated to four projects, three of which will be closed. This action will enable the City to redirect funds toward projects that require immediate attention.

                     (st1803) Street Lighting Enhancement - ($200,000) RELEASE

                     (st1805) ECR Gateway Sign & Median Improvement (Noor/Spruce) - ($42,985.38) CLOSED

                     (st2002) Survey Monument - ($125,000) RELEASE

                     (st2305) CDBG Curb Ramp Replacement - ($150,025.86) CLOSED

TOTAL REFUND TO Infrastructure Reserve = $518,011.24

Sewer Enterprise Fund Refund: To support sustainable resource management, the City has thoroughly reviewed current and upcoming projects dependent on Sewer Enterprise Funds. As a result, four projects are recommended for closure and nine for deferral. Additionally, two projects will be reclassified and moved to the Capital Outlay Fund. These actions will release a total of $11.87 million back into the Sewer Enterprise Fund to support critical needs in FY 2025-26 and future years.

                     (ss1301) WQCP Wet Weather and Digester Improvements - ($564,441.59) CLOSED

                     (ss1601) Sodium Hypochlorite Tank Replacement - ($57,201.08) CLOSED

                     (ss1703) WQCP Secondary Clarifiers #1 & #2 Rehabilitation - ($1,316,576.22) CLOSED

                     (ss1704) WQCP Effluent Storage Basin Liner Replacement - ($855,993.07) CLOSED

                     (ss1307) Plant Wide Industrial Re-Coat - ($2,000,000) RELEASE

                     (ss2302) WQCP Sludge Dewatering Improvements - (1,393,290) RELEASE

                     (ss1205) WQCP Solar PV - ($270,356.94) DEFER

                     (ss1901) Pump Station Industrial Re-Coating Program - ($2,125,266.56) DEFER

                     (ss2301) WQCP Diffused Air Flotation Thickener - ($548,100) DEFER

                     (ss2404) Programmable Logic Controller Replacement -WQCP - ($1,498,140) DEFER

                     (ss2407) SB1383 Organic Diversion Mandate Compliance - ($73,080) DEFER

                     (ss2408) Biosolids Drying & Recycling- Project #2 - ($73,080) DEFER

                     (ss2501) Sanitary Pump Stations 5, 6, 7 Upgrade - ($219,240) DEFER

TOTAL REFUND to Sewer Enterprise Fund = $10,994,765.46

Additional Project Closures/Refunds:

The City has also identified three additional projects for adjustment across other funding sources. One project will be closed, resulting in an additional release of $1,165,073.24. These actions are intended to align remaining project balances with evolving capital priorities and funding needs.

                     (pf2205) Oyster Pt Phase 2C Parking Lot Improvement - ($150,000) RELEASE

                     (pf2206) Oyster Pt Phase 2C Landscape Improvement - ($150,000) RELEASE

                     (pk2309) OMP Sports Field Renovation (BONDS 522) - ($865,073.24) CLOSE

TOTAL REFUND to Other = $1,165,073.24

 

CEQA REVIEW

Adoption of the CIP is not a “project” subject to review under the California Environmental Quality Act (“CEQA”) pursuant to Section 15378(b)(4) of the State CEQA Guidelines

FUNDING

The staff report outlines the proposed FY 2025-26 CIP budget allocations, totaling $232.82 million. This includes $24.03 million in new appropriations and approximately $208.79 million carried over from prior years for ongoing projects. To further support the City's financial needs in the current and upcoming fiscal years, $12.68 million has been identified for reallocation from the Infrastructure Reserve, Sewer Enterprise Fund, and other funding sources.  Specific projects recommended for funds release, closure, or deferral are outlined in Attachment 3: Proposed Project Closures and Deferrals. These adjustments enable the City to redirect resources toward higher-priority needs. Projects identified for closure or deferral are not included in the FY 2025-26 Budget Book. However, deferred projects may be revisited and resubmitted as new proposals in future CIP cycles, depending on evolving priorities and funding availability.

Attachment 1: CIP Proposed Budget Book FY 2025-26 includes the full set of proposed projects and appropriations. Attachment 2: Funding Source Report FY 2025-26 provides a detailed breakdown of funding allocations by project and funding source, including visual summaries showing the distribution of the $24.03 million in new appropriations by source and project type.

These actions reflect the City’s ongoing commitment to responsible fiscal management and continued investment in infrastructure that serves South San Francisco’s residents, businesses, and visitors.

RELATIONSHIP TO STRATEGIC PLAN

Approval of this action will contribute to the City’s Strategic Plan outcome of improved Quality of Life by maintaining and improving infrastructure to serve the public.

CONCLUSION

It is recommended that the City Council adopt a resolution approving the CIP for FY 2025-26, approving $24.03 million in new appropriations, authorizing City staff to prepare plans and specifications and advertise for construction bids for the projects under this program, and approving the reimbursement of $12.68 million from prior-year funding along with Budget Amendment No. 25.060 to reflect the reallocation.

 

Attachments:

1.                     Attachment 1 - CIP Proposed Budget Book FY 25-26

2.                     Attachment 2 - Funding Source Report FY 25-26

3.                     Attachment 3 - Proposed Project Closures and Deferrals

4.                     Attachment 4 - PowerPoint Capital Improvement Program FY 25-26