Title: Report regarding a resolution authorizing the approval of Budget Amendment #23.073 to include Program Supplemental Agreement No. F028 with the State of California for the Bridge Preventive Maintenance Program (Project No. st1703) in the amount of $115,089 and remove the $1,569,000 Highway Bridge Program grant amount from the total budget; and authorizing the approval of Budget Amendment #23.075 to remove the $528,000 Highway Bridge Program grant from the total project budget for the Grand Avenue Overhead Structure at US 101(Project No. st1804). (Lawrence Henriquez, Senior Civil Engineer)
Attachments: 1. Staff Report BPMP Attachment 1
Related files: 23-310

Title

Report regarding a resolution authorizing the approval of Budget Amendment #23.073 to include Program Supplemental Agreement No. F028 with the State of California for the Bridge Preventive Maintenance Program (Project No. st1703) in the amount of $115,089 and remove the $1,569,000 Highway Bridge Program grant amount from the total budget; and authorizing the approval of Budget Amendment #23.075 to remove the $528,000 Highway Bridge Program grant from the total project budget for the Grand Avenue Overhead Structure at US 101(Project No. st1804). (Lawrence Henriquez, Senior Civil Engineer)

 

label

RECOMMENDATION

Recommendation

It is recommended that the City Council adopt a resolution authorizing the approval of Budget Amendment #23.073 to include Program Supplemental Agreement No. F028 for the Bridge Preventive Maintenance Program (st1703) in an amount of $115,089 and remove the $1,569,000 Highway Bridge Program grant amount from the total budget; and authorizing the approval of Budget Amendment #23.075 to remove the $528,000 Highway Bridge Program grant from the total project budget for the Grand Avenue  Overhead Structure at US 101 (st1804).

 

Body

BACKGROUND/DISCUSSION

The City of South San Francisco (“City”) has an ongoing Bridge Preventive Maintenance Program (BPMP) for the fourteen (14) vehicle bridges that are under the Caltrans Bridge Inspection Program. The BPMP was created to help local agencies extend the life of their bridges by performing certain activities that have been preapproved by the Federal Highway Administration.

 

The Bridge Preventive Maintenance Program Goals are to:

 

1.                     Maintain the existing inventory of bridges in a structurally safe and serviceable condition.

2.                     Correct minor structural deficiencies early in a bridge's life, rather than wait until a bridge has major problems requiring costly rehabilitation, reconstruction or replacement.

3.                     Extend the service lives of existing bridges.

4.                     Make efficient use of limited resources.

 

Caltrans inspects the bridges every two-years and submits its findings to the City. City staff determines the appropriate actions based upon the reports and Caltrans work recommendations.

 

The City is currently planning to rehabilitate 10 of the 14 bridges and the following table summarizes the future work:

 

 

 

 

 

 

 

 

 

PROJECT NO.

DESCRIPTION

NOTES

st1703

Dunman St at Hickey Blvd #35C0032

Current BPMP* (Design)

st1703

Colma Creek Bridge at Chestnut Ave #35C0079

Current BPMP (Design)

st1703

Colma Creek Bridge at Spruce Ave #35C0078

Current BPMP (Design)

No work planned

Colma Creek Bridge at Spruce Ave #35C0126

No work indicated per Caltrans Report

st1703

Colma Creek Bridge at Linden Ave #35C0031

Current BPMP (Design)

No work planned

San Mateo Ave at Airport Blvd #35C0048

Repairs completed in 2013

st1703

Colma Creek Bridge at Produce Ave #35C0021

Current BPMP (Design)

st1703

Colma Creek Bridge at Utah Ave #35C0101

Current BPMP (Design)

st1804

Grand Ave OH at US101 #35C0148L

Grant funding expected in FY23/24 (Design)

st1804

Grand Ave OH at US101 #35C0148R

Grant funding expected in FY23/24 (Design)

st1703

Oyster Pt Blvd OH at Gateway Blvd #35C0173

Current BPMP* (Design)

No work planned

San Bruno Canal Bridge at North Access Rd #35C0044

Bridge Replaced in 2018 (New Bridge #35C0206)

st1703

San Bruno Canal Bridge at North Access Rd #35C0046

Current BPMP* (Design)

st1703

San Bruno Canal Bridge at North Access Rd #35C0047

Current BPMP (Design)

 

San Bruno Canal Bridge at North Access Rd #35C0164

Removed from list as it is owned by others

                                                                                                                                                                        *Bridge later added to the current BPMP

 

 

Program Supplemental Agreement No. F028

 

In August of 2016, the City submitted a funding request to Caltrans for the maintenance of seven bridges identified in the Caltrans Bridge Inspection Reports.

 

1

#35C0021

Colma Creek Bridge at Produce Avenue

Repair of Concrete barriers and steel railings, replacing joint seals, and miscellaneous concrete spall repair

2

#35C0031

Colma Creek Bridge at Linden Avenue

Treat bridge deck with methacrylate, concrete spall repairs, replace joint seals, repair concrete barriers and steel railings, repair uneven sidewalk and repair large hole in concrete sidewalk

3

#35C0047

San Bruno Canal Bridge at North Access Road

Provide Cathodic Protection to the pile extensions, (remove unsound concrete and repair spalled surfaces in pile extensions), Inject cracks in pile extensions and bridge soffit

4

#35C0078

Colma Creek Bridge at Spruce Avenue

Treat bridge deck with methacrylate (Polyester Concrete Overlay instead of only methacrylate), and concrete spall repairs on the barriers

5

#35C0079

Colma Creek Bridge at Chestnut Avenue

Clean exposed steel reinforcement and repair concrete spalls at bridge rails

6

#35C0101

Colma Creek Bridge at Utah Avenue

Clean joint seals and deck drains, epoxy inject concrete cracks, repair minor concrete spalls on the barriers, epoxy inject cracks at pier walls, and fill void space under the sidewalk

7

#35C0164

San Bruno Canal Bridge at North Access Road

San Mateo County owned - subsequently removed from program

 

Staff amended the project scope to include maintenance of three (3) additional bridges identified in the latest Caltrans Bridge Inspection Reports received in late 2019, after the original scope was written. Staff also removed bridge #35C0164 from the project once it was determined to be a San Mateo County owned bridge.

 

Staff is currently seeking Caltrans approval to update the project to include additional funding for maintenance of these three bridges and anticipates Caltrans will incorporate the requested modifications.

 

8

#35C0032

Dunman Street at Hickey Boulevard

Replace cracked portion of sidewalk, and repair minor concrete spalls, (epoxy inject concrete cracks in abutment, and Repair asphalt concrete pavement at West abutment)

9

#35C0173

Oyster Pt Boulevard OH at Gateway Boulevard

Repair grade difference on sidewalk and minor concrete spall repairs

10

#35C0046

San Bruno Canal Bridge at North Access Road

Remove, clean and repair headers, and replace joint seals, (and epoxy inject concrete cracks in bridge soffit)

 

#35C0164

San Bruno Canal Bridge at North Access Rd.

San Mateo County owned - subsequently removed from program

 

On November 20, 2019, the City received the Program Supplemental Agreement (PSA) No. F028 from Caltrans authorizing Preliminary Engineering for the original seven (7) bridges in an amount of $115,089.

 

The administration of state and federally funded local transportation projects is carried out by the benefiting agencies through the Caltrans Local Assistance Program. The City of South San Francisco has general authority as an administering agency; however, project-specific supplemental agreements are required for individual projects. The program supplement agreements allow for the reimbursement of project development costs. Program Supplement Agreement No. F028 authorizes Federal funding in the amount of $115,089 for preliminary engineering.

 

FISCAL IMPACT

 

st1703 - Bridge Preventive Maintenance Program:

A Program Supplemental Agreement No. F028 in the amount of $115,089 from Caltrans will be utilized for the Preliminary Engineering Phase. Subsequently, a Highway Bridge Program (HBP) grant fund in the amount of $1,569,000.00 appeared in past Capital Improvement Program (CIP), FY 2017-2018, annual funding assessments. Staff contacted Caltrans seeking the grant agreement and were informed that there was never an HBP grant issued for $1,569,000.

 

Therefore, the total project budget will be reduced by $1,569,000 to correct this error.  The following table summarizes the revised project funding:

 

 

 

General Fund (Existing)

$250,000

Infrastructure Reserves (Existing)

$380,000

Grant HBP - PSA #28

$115,089

Amended Total Project Budget

$745,089

 

As a standard condition of the PSA, the City agrees that any cost increase would be funded by the City. Should higher designer fee estimates be received, the City will be responsible for funding the shortfall to construct and deliver the project.

 

 

st1804 - Bridge Preventive Maintenance Program:

A Highway Bridge Program (HBP) grant fund in the amount of $528,000.00 appeared in past Capital Improvement Program (CIP), FY 2017-2018, annual funding assessments. Staff contacted Caltrans seeking the grant agreement and were informed that there was never an HBP grant issued for $528,000.  Therefore, the total project budget will be reduced by $528,000 to correct this error.  The following table summarizes the revised project funding:

 

Infrastructure Reserves (Existing)

$172,000

Amended Total Project Budget

$172,000

 

It should be noted that staff will be proactively seeking additional funding from state sources to proceed into the design phase.

 

RELATIONSHIP TO STRATEGIC PLAN

Approval of this action will contribute to the City’s Strategic Plan outcome of improved Quality of Life by improving traffic safety and experience.

 

CONCLUSION

Staff recommends that the City Council adopt a resolution authorizing the approval of Budget Amendment #23.073 to include Program Supplemental Agreement No. F028 for the Bridge Preventive Maintenance Program in an amount of $115,089 and remove $1,569,000 from the total project budget(st1703); and authorizing the approval of Budget Amendment #23.075 to remove the $528,000 Highway Bridge Program grant from the total project budget for the Grand Avenue Overhead Structure at US 101(st1804).