Title
Report regarding a resolution adopting a proposed list of projects for fiscal year 2026-27 funded by SB1: The Road Repair and Accountability Act of 2017. (Angel Torres, Senior Civil Engineer)
label
RECOMMENDATION
Recommendation
It is recommended that the City Council adopt a resolution approving a proposed list of projects for fiscal year 2026-27 funded by SB1: The Road Repair and Accountability Act of 2017.
Body
BACKGROUND/DISCUSSION
Senate Bill 1 (SB1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide.
Regulations contained within SB1 require the City to submit to the California Transportation Commission an adopted list of projects proposed to use funds from the Road Maintenance and Rehabilitation Account (RMRA), created by SB1 by July 1, 2026. All projects proposed to receive the fiscal year funding must be adopted by resolution and include the description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement.
This is the tenth year in which the City is receiving SB1 funding, which will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB1. The City is expected to receive $1,859,102 in RMRA funding in fiscal year (FY) 2026-27 from SB1.
The SB1 project listed for FY 2026-27 is part of the City’s current Capital Improvement Program (CIP), which highlights the City’s needed improvements and priorities for implementation. This year’s funding from SB1 will help the City maintain and rehabilitate roads throughout the City. By adopting the proposed list of projects, the City is not committing to a specific dollar allocation for each project. City staff has incorporated the SB1 funding into the proposed FY 2026-27 CIP budget, consistent with this staff report and the details presented to Council.
The following newly proposed project is expected to receive SB1 funds as a funding source for FY 2026-27. This project will be listed to be in-part or solely funded with FY 2026-27 RMRA revenues:
Pavement Management Plan (PMP) 2027 Street Surface Seal (Area 3)
Project Description: This project will consist of local street surface seal treatment, consisting of localized pavement failure repairs, failed concrete curb, gutter, valley gutter replacement, crack seal, surface seal pavement surface treatment, and replacing all existing striping and pavement markings. Useful life elements include concrete repairs, localized pavement repairs, and pavement surface treatment. Design & construction of street surface seal projects as part of the Pavement Management Program (PMP) cycle through Areas 1-6, one area each year, provide new surface seal of streets with new thermoplastic striping, legends, and crosswalks; 2027 will cycle through Area 3.
Project Location: Surface Seal of Area 3, which includes the Sunshine Gardens and Central South San Francisco neighborhoods.
|
Street Name |
Begin Location |
End Location |
|
Morningside Ave. |
Forestview Dr. |
Holly Ave. |
|
Miller Ave. |
Willow Ave. |
Forestview Dr. |
|
Miller Ave. |
Forestview Dr. |
Holly Ave. |
|
Crestwood Dr. |
Crestwood Dr. (Northwest corner of Crestwood Dr.) |
Morningside Ave. |
|
Douglas Way |
Holly Ave. |
Gardenside Ave. |
|
Birch Ave. |
Holly Ave. |
Gardenside Ave. |
|
Oakcrest Ave. |
Baywood Ave. |
Miller Ave. |
|
Edgewood Way |
Sequoia Ave. |
End |
|
Ferndale Ave. |
Baywood Ave. |
Morningside Ave. |
|
Dolores Way |
Willow Ave. |
Hillside Blvd. |
|
Gardenside Ave. |
Birch Ave. |
Morningside Ave. |
|
Livingston Pl. |
Chestnut Ave. |
James Ct. |
|
Crestwood Dr. |
Crestwood Dr. (Northwest of Crestwood Dr.) |
Evergreen Dr. |
|
Crestwood Dr. |
Evergreen Dr. |
Gardenside Ave. |
|
Crestwood Dr. |
Gardenside Ave. |
Holly Ave. |
|
Gardenside Ave. |
Baywood Ave. |
Miller Ave. |
|
Heather Way |
Miller Ave. |
Crestwood Dr. |
|
Willow Ave. |
Grand Ave. |
Dolores Way |
|
Willow Ave. |
Dolores Way |
Forestview Dr. |
|
Nora Way |
Susie Way |
Willow Ave. |
|
Brusco Way |
Susie Way |
Willow Ave. |
|
Westview Dr. |
Westview Dr. (Elbow) |
Miller Ave. |
|
Holly Ave. |
Mission Rd. |
Miller Ave. |
|
Holly Ave. |
Crestwood Dr. |
Hillside Blvd. |
|
Baywood Ave. |
Sequoia Ave. |
Evergreen Dr. |
|
Holly Ave. |
Miller Ave. |
Crestwood Dr. |
|
Sequoia Ave. |
Baywood Ave. |
Miller Ave. |
|
Sequoia Ave. |
Mission Rd. |
Baywood Ave. |
|
Evergreen Dr. |
Mission Rd. |
Miller Ave. |
|
Evergreen Dr. |
Miller Ave. |
Crestwood Dr. |
|
Forestview Dr. |
Grand Ave. |
Miller Ave. |
|
Forestview Dr. |
Miller Ave. |
Willow Ave. |
|
Forestview Dr. |
Willow Ave. |
Morningside Ave. |
|
Evergreen Dr. |
Crestwood Dr. |
Morningside Ave. |
|
Evergreen Dr. |
Morningside Ave. |
Hillside Blvd. |
|
Crestwood Dr. |
Dolores Way |
Holly Ave. |
|
Emerald Ct. |
Sunnyside Dr. |
End |
|
Clover Cir. |
Sunnyside Dr. |
Clover Cir. |
|
Sunnyside Dr. |
Miller Ave |
Forestview Dr. |
|
Westview Dr. |
Holly Ave |
Westview Dr. (Elbow) |
|
Aldenglen Dr. |
Grand Ave |
End |
|
James Ct. |
North End |
South End |
|
W. Orange Ave. |
Memorial Dr |
Circle Ct./Railroad Ave. |
|
Orange Ave. |
Baden Ave. |
Grand Ave. |
|
Magnolia Ave. |
Grand Ave. |
Baden Ave. |
|
Magnolia Ave. |
Baden Ave. |
Commercial Ave. |
|
Magnolia Ave. |
Commercial Ave. |
Railroad Ave. |
|
S. Spruce Ave. |
Grand Ave. |
Railroad Ave. |
|
S. Spruce Ave. |
Railroad Ave. |
N. Canal St. |
|
S. Spruce Ave. |
N. Canal St. |
S. Canal St |
|
S. Spruce Ave. |
S. Canal St. |
Starlite St. |
|
S. Spruce Ave. |
Starlite St. |
Terrace Dr. |
|
Eucalyptus Ave. |
Baden Ave. |
Grand Ave. |
|
Laurel Ave. |
Baden Ave. |
Grand Ave. |
|
Acacia Ave. |
Grand Ave. |
Baden Ave. |
|
Nursery Way |
Chestnut Ave. |
Nursery Way (Beginning of circle) |
|
Eucalyptus Ave. |
Baden Ave. |
Commercial Ave. |
|
Eucalyptus Ave. |
Commercial Ave. |
Circle Ct. |
|
Antoinette Ln. |
Chestnut Ave. |
East End |
|
3rd Ln. |
Orange Ave. |
Chestnut Ave. |
|
Baden Ave. |
Chestnut Ave. |
Orange Ave. |
|
Commercial Ave. |
Orange Ave. |
Chestnut Ave. |
|
2nd Ln. |
Chestnut Blvd. |
377 ft. before Orange Ave. |
|
2nd Ln. |
377 ft. North of Orange Ave. |
Orange Ave. |
|
Tennis Dr. |
Orange Ave. |
End of street |
|
Circle Ct. |
Orange Ave. |
End of street |
|
Nursery Way |
Nursery Way (Beginning of circle) |
Nursery Way (End of circle) |
|
Railroad Ave. |
Orange Ave. |
Spruce Ave. |
|
First Ln. |
Spruce Ave. |
805 ft. before Orange Ave. |
|
First Ln. |
805 ft. before Orange Ave. |
Orange Ave. |
|
Commercial Ave. |
Orange Ave. |
Spruce Ave. |
|
Baden Ave. |
Orange Ave. |
Spruce Ave. |
|
2nd Ln. |
Orange Ave. |
Spruce Ave. |
|
3rd Ln. |
Spruce Ave. |
Magnolia Ave. |
|
3rd Ln. |
Orange Ave. |
E End |
|
Summerrain Dr. |
Aldenglen Dr. (North) |
Aldenglen Dr. (South) |
|
Edgewood Way |
Evergreen Dr. |
End |
|
Lucca Dr. |
Hillside Blvd. |
Lucca Dr. (Beginning of loop South int) |
|
Lucca Dr. |
Lucca Dr. (Beginning of loop South intersection) |
Lucca Dr. (End of loop North intersection) |
|
Beverly Ct. |
South End |
Dolores Way |
|
Susie Way |
North End |
South End |
|
Sandra Ct. |
Susie Way (North) |
Susie Way (South) |
|
Gardenside Ave. |
Crestwood Dr. |
Birch Ave. |
|
Gardenside Ave. |
Miller Ave. |
Crestwood Dr. |
|
Chestnut Ave. |
Grand Ave. |
Commercial Ave. |
|
Mission Rd. |
Chestnut Ave. |
Oak Ave. |
|
Mission Rd. |
Oak Ave. |
350 ft. West of Oak Ave. |
|
Miller Ave. |
Holly Ave. |
Gardenside Ave. |
|
Mission Rd. |
350 ft W/O Oak Ave. |
Grand Ave. |
|
Mission Rd. |
Grand Ave. |
Sequoia Ave. |
|
Mission Rd. |
Sequoia Ave. |
Lawndale Blvd. |
|
Terminal Ct. |
Produce Ave. |
Terminal Ct. (End) |
|
Produce Ave. |
San Mateo Ave. |
Freeway |
|
NB Airport Blvd. |
San Mateo Ave. |
Bridge / Pavement Change |
|
NB Airport Blvd. |
Bridge / Pavement Change |
RR/Bridge |
|
NB Airport Blvd. |
RR/Bridge |
Baden Ave. |
|
San Mateo Ave. |
Bridge (End) |
Airport Blvd. |
|
San Mateo Ave. |
Bridge (Beginning) |
Bridge (End-Near Produce Av.) |
|
San Mateo Ave. |
S. Linden Ave. |
Bridge (Colma Creek) |
|
Lowrie Ave. |
N. San Mateo Ave. |
S. San Mateo Ave. |
|
Shaw Rd. |
San Mateo Ave. |
City Limit (N/O Hwy 380) |
|
Victory Ave. |
S. Linden Ave. |
S. Maple Ave |
|
Victory Ave. |
S. Maple Ave. |
S. Spruce Ave. |
|
S. Maple Ave. |
Tanforan Ave. |
Browning Way |
|
S. Maple Ave. |
Browning Way |
Victory Ave. |
|
S. Maple Ave. |
Victory Ave. |
S. Canal St. |
|
Browning Way |
S. Maple Ave. |
W End |
|
S. Linden Ave. |
S. Canal St. |
Victory Ave. |
|
S. Linden Ave. |
Victory Ave. |
Dollar Ave. (RR Tracks) |
|
S. Linden Ave. |
Dollar Ave. (RR Tracks) |
San Mateo Ave. |
|
Dollar Ave. |
S. Linden Ave. |
Tanforan Ave. |
|
Tanforan Ave. |
Dollar Ave. |
S. Maple Ave. |
|
Tanforan Ave. |
San Mateo Ave. |
Railroad Pl. |
|
Ryan Way |
Victory Ave. |
End |
|
Starlite St. |
S. Spruce Ave. |
S. Canal St. |
|
N. Canal St. |
S. Linden Ave. |
480 ft. West of S. Linden Ave. |
|
N. Canal St. |
480 ft. West of S. Linden Ave. |
S. Spruce Ave. |
|
N. Canal St. |
Spruce Ave. |
Orange Ave. |
|
Linden Ave. |
Grand Ave. |
Baden Ave. |
|
Linden Ave. |
Railroad Ave. |
Baden Ave. |
|
S. Linden Ave. |
Railroad Ave. |
N. Canal St. |
|
S. Linden Ave. |
N. Canal St. |
S. Canal St. |
|
S. Canal St. |
S. Spruce Ave. |
S. Linden Ave. |
|
Maple Ave. |
Grand Ave. |
Baden Ave. |
|
Maple Ave. |
Baden Ave. |
Railroad Ave. |
|
First Lane |
Linden Ave. |
Spruce Ave. |
|
Railroad Ave. |
Spruce Ave. |
Maple Ave. |
|
Railroad Ave. |
Maple Ave. |
Linden Ave. |
|
Commercial Ave. |
Linden Ave. |
Spruce Ave. |
|
Village Way |
S. Linden Ave. (North) |
S. Linden Ave. (South) |
|
Baden Ave. |
Spruce Ave. |
Maple Ave. |
|
Baden Ave. |
Maple Ave. |
Linden Ave. |
|
Baden Ave. |
Linden Ave. |
Airport Blvd. |
|
2nd Ln. |
Spruce Ave. |
Maple Ave. |
|
2nd Ln. |
Maple Ave. |
Linden Ave. |
|
2nd Ln. |
Linden Ave. |
Airport Blvd. |
|
S. Magnolia Ave. |
Mayfair Ave. |
End |
|
S. Magnolia Ave. |
Myrtle Ave. |
Mayfair Ave. |
|
Cypress Ave. |
Baden Ave. |
Grand Ave. |
|
3rd Ln. |
Linden Ave. |
Spruce Ave. |
|
Manzanita Ave. |
Myrtle Ave. |
Mayfair Ave. |
|
Mulberry Ave. |
Sycamore Ave. |
Mayfair Ave. |
|
Sycamore Ave. |
Toyon Ave. |
Myrtle Ave. |
|
Toyon Ave. |
Cherry Ave. |
Mulberry Ave. |
|
Cherry Ave. |
Myrtle Ave. |
Mayfair Ave. |
|
Redwood Ave. |
S. Magnolia Ave. |
Manzanita Ave. |
|
Redwood Ave. |
Fir Ave. |
East End |
|
Redwood Ave. |
Manzanita Ave. |
Fir Ave. |
|
Fir Ave. |
Myrtle Ave. |
Mayfair Ave. |
|
Myrtle Ave. |
S. Spruce Ave. |
W. Orange Ave. |
|
Mayfair Ave. |
Myrtle Ave. |
S. Spruce Ave. |
|
3rd Ln. |
Linden Ave. |
Cypress Ave. |
|
Grand Ave. |
Mission Rd. |
Chestnut Ave. |
|
SB Airport Blvd. |
Grand Ave. |
Baden Ave. |
|
NB Airport Blvd. |
Baden Ave. |
Grand Ave. |
|
Miller Ave. |
Gardenside Ave. |
Evergreen Dr. |
|
Morningside Ave. |
Crestwood Dr. |
Evergreen Dr. |
|
Morningside Ave. |
Evergreen Dr. |
Holly Ave. |
|
Amberwood Cir. |
N. Canal St. |
Amberwood Cir. |
|
Antoinette Ln. |
Chestnut Ave. |
West End |
|
Bay Ct. |
Idlewood Dr. |
End |
|
Chestnut Ave. |
Antoinette Ln. |
El Camino Real |
|
Chestnut Ave. |
Mission Rd. |
Antoinette Ln. |
|
Chestnut Ave. |
Commercial Ave. |
Mission Rd. |
|
Commercial Ave. |
Chestnut Ave. |
Oak Ave. |
|
Daly Ct. |
Commercial Ave. |
End |
|
Estate Ct. |
Willow Ave. |
North End |
|
Idlewood Dr. |
Mahogany Dr. |
N. Canal St. |
|
Idlewood Ct. |
Mahogany Dr. |
End |
|
Iris Ct. |
Forestview Dr. |
End |
|
Ivy Way |
Railroad Ave. |
Idlewood Dr. |
|
Mahogany Dr. |
N. Canal St. |
Idlewood Ct. |
|
Oak Ave. |
Mission Rd. |
Commercial Ave. |
|
Oak Ave. |
Commercial Ave. |
Grand Ave. |
|
Sunnyside Dr. |
Holly Ave. |
Forestview Dr. |
|
Dellbrook Ave. |
Crestwood Dr. |
Morningside Ave. |
|
Orange Ave. |
Railroad Ave. |
Baden Ave. |
|
SB Airport Blvd. |
RR/Bridge |
Bridge / Pavement Change |
|
SB Airport Blvd. |
Bridge / Pavement Change |
San Mateo Ave. |
|
SB Airport Blvd. |
Baden Ave. |
RR/Bridge |
Estimated Project Schedule: Pre-construction - August 2026 to April 2027
Construction - May 2027 to October 2027
Estimated Project Useful Life: 5 to 10 years
The SB1 project list, and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety; investing in complete streets infrastructure; and using cutting-edge technology, materials, and practices; will have significant positive co-benefits statewide.
FISCAL IMPACT
The Proposed FY 2026-27 Capital Improvement Program will appropriate RMRA funds to the listed project(s).
RELATIONSHIP TO CITY COUNCIL PRIORITIES ACTION PLAN
Approval of this action will contribute to the City Council Priorities Action Plan Major Focus Area of improved Quality of Life by contributing funds to roadway improvement projects.
CONCLUSION
Approving the list of projects for RMRA funds will ensure that the City meets the deadline to submit a resolution adopting the list of projects proposed to be funded by RMRA to the California Transportation Commission by July 1, 2026.